Page 3 of 6 FirstFirst 12345 ... LastLast
Results 41 to 60 of 110

Thread: New Basement Studio

  1. #41
    PRS Addiction CoreyT's Avatar
    Join Date
    Jun 2012
    Location
    Auburn, WA. USA
    Posts
    2,661
    Quote Originally Posted by JMintzer View Post
    They used to sell them in the PRS Accessory Shop...


    Jamie
    Thanks1
    Quote Originally Posted by Shawn@PRS View Post
    We'll have some cool man-cave items at the Experience this year. Stop by the T shirt tent and check out the new stuff.
    Will the posters be online too?

  2. #42
    Senior Member themike's Avatar
    Join Date
    Apr 2012
    Posts
    1,838
    Quote Originally Posted by Shawn@PRS View Post
    We'll have some cool man-cave items at the Experience this year. Stop by the T shirt tent and check out the new stuff.
    Ohhhhhhhhh this could be dangerous! haha
    Paul Reed Smith 7 - S t r i n g A c t i v i s t | Fueled by P T C

  3. #43
    Senior Member Rango's Avatar
    Join Date
    Aug 2012
    Location
    The FAR SIDE of the Middle of Nowhere
    Posts
    971
    I'd love to have one of the posters for my music room! Maybe they will add them back to the store?

  4. #44
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    some drywall...


    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  5. #45
    Bobble Head Moderator JMintzer's Avatar
    Join Date
    Apr 2012
    Location
    Potomac, MD
    Posts
    1,372
    I'm lovin' all the electrical outlets! I had my contractor load up my room, as well...


    Jamie

  6. #46
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    Quote Originally Posted by JMintzer View Post
    I'm lovin' all the electrical outlets! I had my contractor load up my room, as well...


    Jamie
    It's not so bad puttin' in the boxes and running the wires. It's when it is time for drywall that you wonder if you went overboard. There are 12 double outlets, 7 single outlets, 1 double switch and 3 single switches - and each had to be accurately measured for a hole in the drywall.

    There was not a single sheet that didn't require a cut or holes or both.
    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  7. #47
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    OK, I fibbed.

    Two sheets went up in the closet without any major measuring.... But really - are you gonna hold that against me?
    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  8. #48
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    Some window details.

    The basement windows are set into the concrete walls with a little lip and are positioned pretty high. They can be set to open inwards from the top down or the bottom up. From the top down provides better air on nice days. When open, the window pane is raised pretty high - higher than the finished ceiling will be necessitating a bump out.

    Here is the framing:



    And here is what it looks like with drywall and some boards for the sill and sides. Gaps will be filled with caulk before painting.

    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  9. #49
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    After the drywall usually comes mud and sanding. But I learned from the other parts of the basement that good light is critical to getting a smooth spackle finish - especially if you intend to use semigloss paint.

    So, instead of jumping right into the mud, I do all the seams where the finish ceiling will be and paint a strip. With the strip up at the approx ceiling height, it's time to get out the 3 axis laser level and mark for the side rails of the ceiling. (a pic of the laser level will appear when I'm working on the closet shelf)

    After I have the L brackets on the walls, it's time to run the mail support brackets. Surveyor's string helps keep them straight and level.





    Install a few lights...





    And then the rest of the ceiling panels...





    Details on the HVAC ducting next....
    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  10. #50
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    While I'm getting better pics of the HVAC, here are pics of the primed and painted walls...







    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  11. #51
    Senior Member themike's Avatar
    Join Date
    Apr 2012
    Posts
    1,838
    Wow man you'ree doing an absolutely amazing job! I love it!!!!
    Paul Reed Smith 7 - S t r i n g A c t i v i s t | Fueled by P T C

  12. #52
    Senior Member Dirty Bob's Avatar
    Join Date
    Apr 2012
    Location
    State of Confusion (NY)
    Posts
    1,839
    coming along nicely!
    -Bob

  13. #53
    chief Shawn@PRS's Avatar
    Join Date
    Aug 1985
    Location
    Stevensville, MD
    Posts
    3,665
    Looks amazing!

  14. #54
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    HVAC...


    When I started the basement, there were 2 very small registers cut directly into the supply ducting pointing down from the joist ceiling. That is not nearly enough ventilation and I was planning to hide the ducting as well.

    In rooms that would be occupied (i.e. not store rooms), This is what I ended up with:

    A ceiling vent with adjustable damper - 2 of them in the media room, one in the shop and two in the studio.





    I had to tapp the supply duct for each one and run flex and rigid ducts:



    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  15. #55
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    Let's finish the floor!

    "dimensional" lumber is anything but... You can take great pains to select the straightest, highest quality lumber and you will still have to deal with sloppy tolerances.

    In this case the tolerances are those of the 2X4 pressure treated 'sleepers' and the plywood decking. A bow here, a variance in thickness there and you end up with ledges where the plywood panels meet.

    That means leveling compound...







    Fortunately it is relatively easy to work with and sands to a feather edge



    The finished floor is a product called 'Allure' available only at the Home Depot. It is a 'Resilient Plank Flooring' that is laid down in strips with its own self adhesive edges.





    This is a 'floating floor.' It is not glued or taped to the subfloor. You cut it with a utility knife or heavy shears.

    This particular finish is "Teak."





    Trim is next!
    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  16. #56
    Bobble Head Moderator JMintzer's Avatar
    Join Date
    Apr 2012
    Location
    Potomac, MD
    Posts
    1,372
    Sweet!
    ---Jamie---

    My Gear

  17. #57
    A♥ hoards guitars A♥ rugerpc's Avatar
    Join Date
    Jun 2012
    Location
    deep in the raspberry...
    Posts
    3,397
    The trim.

    I had to frame around the existing steel door and the window with bumpouts to the finished and insulated walls. That required some finish framing to make the bumpouts smooth.







    Then some caulk...







    Some of the interior door frames had to be shimmed...



    Then up went the clamshell and baseboard...

    Thbbbbbt...
    Check it out: Phillybri used to have a band: Resonance But he's soooo over them now!
    Lexicon
    ísɹǝqɯǝɯ uɐıןɐɹʇsnɐ oןןǝɥ

  18. #58
    Senior Member themike's Avatar
    Join Date
    Apr 2012
    Posts
    1,838
    Im seriously surprised at how anxious I am getting for this! Its not even my studio! hahah
    Paul Reed Smith 7 - S t r i n g A c t i v i s t | Fueled by P T C

  19. #59
    Wow, what an amazing job you did. Can I hire you if I ever manage to get a house for grown-ups?
    Alex

  20. #60
    Theater blanket, resilient channel, 1 pound rubber...

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •